摘要 漩门二期蓄谈围垦工程海堤于2005年竣工,各段海堤均发生了不同程度的固结变形,按现行相关规范要求部分堤段高程已不满足规范设计要求,亟需对该段海堤进行相关防潮标准物理模型试验。本次选取工后沉降最大的断面,按设计水文要素对选取断面进行越浪量物理模型试验验证。试验结果表明,海堤固结沉降最大断面,波浪爬高和越浪量仍可满足规范,与规范计算值保持较强的一致性。 Sea embankments of Xuanmen Phase II Xudan Reclamation Project were completed in 2015.Since then,several sections have experienced consolidation and deformation of varying degrees,altitude of which failing to meet the current design standard requirements.It is urgent to conduct tide control standard physical model tests on these embankments.This study selected the section with maximum settlement and conducted wave overtopping physical model test according to hydrological design factors.Results showed that for the embankment section with maximum consolidation and settlement,the wave run - up and overtopping can still meet to the design specifcations,largely consistent with calculated values of specifcations.
出处 《浙江水利科技》 2018年第1期1-3,11,共4页 Zhejiang Hydrotechnics
基金 国家重点研发计划课题(2016YFC0400909)
关键词 防潮标准 固结沉降量 物理模型 挡浪墙高程 wave control standard consolidation settlement physical model wave barrier altitude
  • 相关文献

参考文献2

二级参考文献9

  • 1天津城市规划设计院,天津临港工业区建设开发有限公司.天津临港工业区总体规划[R].天津:天津城市规划设计院,2004.
  • 2中交第一航务工程勘察设计院.天津临港工业区滩涂开发一期工程工程可行性研究报告[R].天津:中交第一航务工程勘察设计院.2004.
  • 3GB50296-98堤防工程设计规范[S].
  • 4JTJ213-98海港总平面设计规范[S].
  • 5JTJ290-98港口及航道护岸工程设计与施工规范[S].
  • 6GB50187-93.工业企业总平面设计规范[S].[S].,..
  • 7GB50201-94.防洪标准[S].[S].,..
  • 8JTJ213-98.海港水文规范[S].[S].,..
  • 9风暴潮灾害防治及海堤工程技术研讨会论文集[M].北京:中国水利水电出版社.2008.

共引文献11

同被引文献16

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部