期刊文献+

EPC公路项目总承包设计管理流程

EPC Highway Project General Contract Design Management Process
下载PDF
导出
摘要 随着国际化的发展,走出国门的中国企业越来越多。国际项目以EPC承包模式为主,为了更好的适应国际化的环境和高速公路项目设计管理的需求,本文着重通过对设计管理流程的设计方案总包策划流程、设计文件内部审批流程、设计文件外部审批流程、设计变更决策流程、设计进度控制流程、设计文档管理流程和设计争议处理流程进行了深入的分析,以期达到高速公路项目的安全、质量、进度、环保履约和实现项目既定的商务和社会目标。 With the development of internationalization, more and more Chinese enterprises are going abroad to search opportunities. EPC general contract model gradually becomes to one of the mainstream models in international project contracts. To adapt better to the international environment and meet the requirements of highway project design and management, this article mainly analyse the planning process of design scheme in general contract, the internal approval process of design documents and the processing flow of divergences in design, in order to implement security, quality, progress in highway projects, ensure environmental protection and realize the commercial and social goals.
出处 《中国住宅设施》 2017年第10期12-16,共5页 China Housing Facilities
关键词 设计管理 EPC项目 流程化 阿尔及利亚 高速公路 design management, EPC contract, customized process, Algiers, highway
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部