浅谈旋喷桩在风积沙隧道的应用 被引量:2

Application of rotary churning pile in aeolian sand tunnel
下载PDF
导出
摘要 本文以青海省茶卡至格尔木高速公路脱土山隧道为依托,针对该隧道出口段围岩为风积沙,自稳性极差,易坍塌的特点,设计采取旋喷桩对地表及基础进行预加固,充分利用了旋喷桩的加固、挤密、增加含水量等作用机理,取得了一定效果,希望能为今后风积沙隧道施工提供借鉴和参考,同时也为一些不良地质路段处理施工提供了一种解决途径。 Based on Tuotu mountain tunnel of Chaka-Golmud Expressway in Qinghai province,this paper discussed the application of rotary churning pile with Aeolian sand,which have the characteristics of poor self-stability,easy to collapse.The tunnel design adopt rotary churning pile to pre-reinforce the ground and foundation with mechanism of reinforcement,compaction,increment of moisture content,and achieved certain results.The application of rotary churning pile in aeolian sand tunnel could provide reference for the future of aeolian sand tunnel construction,also provide a way to solve some bad geological sections.
作者 马斌
出处 《青海交通科技》 2017年第5期124-126,共3页 Qinghai Transportation Science and Technology
关键词 旋喷桩 风积沙 隧道 应用 rotary churning pile aeolian sand tunnel, application
  • 相关文献

同被引文献20

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部