深孔预裂爆破技术在深井坚硬完整顶板强制放顶中的应用 被引量:19

Application of deep-hole presplitting blasting technology in forced roof caving in hard complete roof deep shaft
下载PDF
导出
摘要 为解决察哈素煤矿综采工作面初采来压步距大,初采危险隐患大的问题,采用理论计算、现场试验的方法,应用深孔预裂爆破技术在31307综采工作面切眼进行了强制放顶试验。通过深孔预裂爆破后的矿压分析,结果表明,在工作面推进距离距切眼41.2m处,工作面初次来压,来压强度和距离均比前两个工作面有明显降低;对支架影响较小,避免了采空区飓风等危险因素,确保了工作面的安全生产。该技术对新街矿区类似条件的工作面强制放顶具有很好的借鉴意义。 To solve the intense initial weighting interval of Chahasu Mine fully-mechanized coal face,eliminate hidden danger,deep hole presplitting blasting technology was applied in 31307 full mechanized coal face after the theoretical calculation,field test method. The analysis of ground pressure showed that the initial weighting interval of roof was 41. 2 m,the roof weighting interval and weighting strength decreased significantly compared with the previous two working face,which had less influence on hydraulic support and avoided the goaf hurricane risk factors and ensured the safe production of the working face.
出处 《煤炭工程》 北大核心 2018年第1期42-44,共3页 Coal Engineering
关键词 采矿工程 深孔爆破 深井 强制放顶 完整顶板 mining engineering deep borehole blasting deep well forced roof caving complete roof
  • 相关文献

参考文献5

二级参考文献43

共引文献204

同被引文献150

引证文献19

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部