摘要
结合南京金鹰天地广场项目三栋塔楼大体积底板混凝土施工及技术要求,模拟浇筑C50P10大体积混凝土深基坑,同时通过预埋传感器的方法对混凝土进行温度和变形监测,可为实际生产提供技术依据。
Based on the concrete construction and technical requirements of the large baseplate of three towers in Nanjing GOLD EAGLE square, the concrete pouring of csoP10 was simulated to provide the technical basis for the actual production. Meanwhile, real-time monitoring of concrete pit for temperature and deformation was carried out by embedded sensors.
出处
《混凝土与水泥制品》
北大核心
2018年第1期89-92,共4页
China Concrete and Cement Products
关键词
大体积混凝土
温度
开裂
变形
mass concrete
temperature
crack
deformation