期刊文献+

水力压裂技术在综采工作面初放顶板控制中的应用 被引量:5

Application of hydraulic fracturing technology in initial caving of fully mechanized mining face
下载PDF
导出
摘要 结合大柳塔煤矿12316综采工作面初采期间使用水力压裂控制顶板的技术研究和应用实践,通过井下试验、现场写实、实践验证相结合的方法,研究了水力压裂对顶板岩层的弱化及初次垮落的作用。结果表明,采用水力压裂控制采空区顶板期间,工作面老顶初次来压步距为36 m,要比强制放顶缩短5 m。更重要的是,采空区顶板初次垮落期间未形成冲击,未对工作面产生影响,实现了工作面初采安全,达到了预期的控顶效果,为今后在大柳塔煤矿其他综采工作面的推广应用提供了实践基础。 Combined with the application practice of hydraulic fracturing control roof technology during the initial mining period of No.12316 fully mechanized mining face in Daliuta Coal Mine,by using the methods of underground test,field observation and practice verification,the effect of hydraulic fracturing on roof rock weakening and initial caving was studied.By using hydraulic fracturing control technology,the first weighting step of main roof in working face is 36 m,which is 5m shorter than that of forced caving.The roof first caving has not formed a shock phenomenon and has no influence on the working face,which realizes the safety of initial mining in working face and achieves the expected control effect.The research provides practical basis for the popularization and application of hydraulic fracturing technology in other fully mechanized mining faces.
出处 《陕西煤炭》 2017年第B08期84-87,134,共5页 Shaanxi Coal
关键词 水力压裂 顶板控制 垮落 来压步距 hydraulic fracturing roof control caving weighting step
  • 相关文献

参考文献4

二级参考文献32

  • 1冯彦军,康红普.水力压裂起裂与扩展分析[J].岩石力学与工程学报,2013,32(S2):3169-3179. 被引量:104
  • 2董尚根,贾飞飞,刘成威.定向水力压裂弱化坚硬顶板技术研究[J].煤炭技术,2015,34(4):7-9. 被引量:15
  • 3邓广哲,王世斌,黄炳香.煤岩水压裂缝扩展行为特性研究[J].岩石力学与工程学报,2004,23(20):3489-3493. 被引量:114
  • 4高存宝,钱鸣高,翟明华,吴兴荣.复合型坚硬顶板在初压期间的再断裂及其控制[J].煤炭学报,1994,19(4):352-359. 被引量:1
  • 5谭云亮,何孔翔,马植胜,闫相宏.坚硬顶板冒落的离层遥测预报系统研究[J].岩石力学与工程学报,2006,25(8):1705-1709. 被引量:17
  • 6DUZGUN H S B. Analysis of roof fall hazards and risk assessment for Zonguldak coal basin underground mines[J]. International Journal of Coal Geotogy, 2005, 64(1/2): 104-115.
  • 7MATSUI K, SHIMADA H, ANWAR H Z. Acceleration of massive roof caving in a long wall gob using a hydraulic fracturing[C]// Proceedings of the 99th International Symposium on Mining Science and Technology. Beijing: [s.n.], 1999:43 - 46.
  • 8HAIMSON B C, CORNET F H. ISRM suggested methods for rock stress estimation-part 3: hydraulic fracturing(HF) and/or hydraulic testing of pre-existing fractures(HTPF)[J]. International Journal of Rock Mechanics and Mining Sciences, 2003, 40(7/8): 1 011 - 1 020.
  • 9JOON-SHIK M. Representativeness of jointed rock mass hydraulic conductivity obtained from packer tests for tunnel inflow rate estimate[J]. International Journal of Rock Mechanics and Mining Sciences, 2011, 48(5):836 - 844.
  • 10GUO F, MORGENSTERN N R, SCOTT J D. An experimental investigation into hydraulic fracture propagation-part 1: experimental facilities[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts, 1993, 30(3): 177 - 188.

共引文献263

同被引文献32

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部