期刊文献+

延安黄河引水工程新舍古倒虹溢流渠的设计优化 被引量:1

下载PDF
导出
摘要 针对延安黄河引水工程文安驿川新舍古倒虹的退水溢流堰的设计难点,对其进行优化。优化结果表明:按照台阶式消能工设计溢流堰,可以在不额外增加工程投资的情况下,使溢流堰末端水流行进流速大大降低,取得良好效果。
作者 刘桓辰
出处 《陕西水利》 2018年第1期143-144,共2页 Shaanxi Water Resources
  • 相关文献

参考文献2

二级参考文献8

  • 1Hans-Erwin Minor. Spillways for high velocities [ A]. In: Proceeding of the international workshop on hydraulics of stepped spillways. Zurich, Switzerland, A. A. Balkema, Rotterdam, 2000, 3: 3-10.
  • 2Chanson H. Comparison of energy dissipation between nappe and skimming flow regimes on stepped chutes [J]. Journal of hydraulic research, IAHR, 1994, 32 (2): 213-218.
  • 3Yasuda Y, Ohtsu I. Flow resistance of skimming flow in stepped channels [A]. Proceeding of the 28th Biennial congress, Spillways and chute structures, B14, IAHR, 1999, 4.
  • 4Yasuda Y, Takahashi M, Ohtsu T. Energy dissipation of skimming flow on stepped channel chutes [ A ]. In: Proceeding of the 29th IAHR congress, Beijing, 2001, 9:531 - 536.
  • 5Yasuda Y, Takahashi M, Ohtsu T. Flow resistance of stepped channel flows [ J ]. Journal of hydraulic engineering,JSCE (in Japanese), 2000, 44: 527-532.
  • 6Takahashi M, Yasuda Y, Ohtsu I. Energy dissipation of skimming flows on stepped channels [J]. Journal of hydraulic engineering, JSCE (in Japanese), 2001, 45 (2): 415-420.
  • 7Nakamura Z. Energy dissipation of nappe flow and skimming flow [D]. Thesis, Nihon University, 2002, 5 (in Japanese) .
  • 8Chanson H. The hydraulic of stepped chutes and spillways [ M ]. A. A. Balkema Publishers, Netherlands, 2002,2.

共引文献52

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部