期刊文献+

桩腿耦合缓冲器国产化应用及应力应变监测 被引量:3

Localization application of the leg mating units and stress and strain monitoring
下载PDF
导出
摘要 桩腿耦合缓冲器(LMU)是一种新型的用于桩腿对接的缓冲装置,主要用于浮托安装过程中缓冲组块与平台基础结构之间的垂直与水平碰撞,减少组块与平台基础结构对强度的要求。LMU依赖国外专业公司提供设计及关键弹性复合材料部件,为打破国外技术垄断及封锁,LMU国产化很重要。文章介绍了对LMU进行专项研发后将研究成果在文昌9-2/9-3 CEP组块浮托安装项目中示范应用,并且进行了整体压缩性能试验和海上测试试验,对其关键钢结构部位进行了应力应变监测,确保LMU结构的完整性,为后续LMU结构设计提供指导。 The Leg Mating Units (LMU) is a new type of buffer for docking of the pile. It is mainly used for vertical and horizontal collision between the buffer block and the platform structure during the float installation to re- duce the strength of the infrastructure requirements. LMU heavily dependent on foreign professional companies to provide design and key elastic composite parts, in order to break the monopoly of foreign technology and blockade, LMU localization is imminent. This paper introduces the research results of LMU after the research and development in the Wenchang 9 -2 / 9 -3 CEP block floatation installation project demonstration application, and carried out the overall compression performance test and sea test, its key steel structure Stress and strain monitoring is carried out to ensure the integrity of LMU structure and provide guidance for follow - up LMU structure design.
出处 《中国修船》 2018年第1期49-51,共3页 China Shiprepair
关键词 缓冲装置 浮托安装 国产化 应力应变监测 buffer device floats installed localization stress and strain monitoring
  • 相关文献

参考文献4

二级参考文献13

  • 1刘东玉,郭刚,徐兴平.海洋平台浮装就位技术研究[J].中国海洋平台,2004,19(6):50-53. 被引量:7
  • 2房晓明,郝军,魏行超.南堡35-2油田中心平台应用浮托法安装新工艺实践[J].中国海上油气(工程),2006,18(2):126-129. 被引量:24
  • 3徐田甜,董坤,王宁.渤中34-1油田CEPA中心平台生活模块结构设计[J].船舶,2007,18(3):40-45. 被引量:3
  • 4ONeill L A,Fakas E,RonaldsBF.History,trends and cvolution of float over deck installation in open waters[C].// SPE Annual Technical Conference and Exhibition,SPE 63037,Texas:Dallas,2000,1-4.
  • 5Michel Seij,Henk de Groot.State of the art in float-overs,19072 MS offshore technology conference[C].Texas:Houston,2007,30.
  • 6Wang Alan M,Jiang Xizbao,Yu Changsheng.Latest progress in floatover tcchnologies for offshore installation and decommission ing[C].China:Proceedings of the Twentieth (2010) International Offshore and Polar Engineering Conference,2010.
  • 7Jong-Jin Jung,Woo-Seob Lee.Evaluating the impact load on the offshore platform during float-over topside installation[C].//Proceedings of the Nineteenth (2009) lntenational Offshore and Polar Engineering Conference,Japan:Osaka,2009,205-210.
  • 8DNV Classification Society.Rules for planning and execution of marine installations[S].1996.
  • 9LOC Marine Warranty Surveyor.Guidelines for marine installations[S].1997.
  • 10中国船级社.钢质海船入级规范[S]{H}北京:人民交通出版社,2006.

共引文献62

同被引文献9

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部