摘要
介绍了朝鲜柳京大厦屋面工程采用1.5 mm厚聚氨酯防水涂膜作隔汽层、双层1.5 mm厚三元乙丙橡胶防水卷材作防水层的涂卷复合防水设计,重点阐述了屋面防水构造设计优化,隔汽层、保温隔热层、高分子防水卷材层、细部节点等部位的防水施工工艺,及防水施工中的注意事项和要求。
This article introduces composite waterproofing design with 1.5 mm thick polyurethane waterproofing coating as vapour barrier and double layers of 1.5 mm thick EPDM waterproofing membrane as waterproofing layer. It outlines optimal design of roof waterproofing structure; waterproofing construction process of vapour barrier, thermal insulation layer, polymer membrane layer and detail nodes; and matters needing attention and requirements during waterproofing construction.
作者
李国亮
齐树凯
Li Guoliang;Qi Shukai(Weifang Hongyuan Waterproof Engineering Co., Ltd., Shouguang, Shandong 262735, Chin)
出处
《中国建筑防水》
2018年第3期32-36,共5页
China Building Waterproofing
关键词
朝鲜地标建筑
涂卷复合防水
双组分聚氨酯防水涂料
三元乙丙橡胶防水卷材
隔汽层
保温隔热层
DPRK landmark
composite waterproofing system with costing and membrane
double-component polyurethane waterproofing coating
EPDM waterproofing membrane
vapour barrier
thermal insulation layer