摘要
中煤阜阳矿业有限公司在总结以往工作面安装工艺基础上,通过优化与改进,逐步形成了一套安全、快速、高效的大采高综采工作面安装工艺,节省了安装时间、降低了安装费用。
China Coal Fuyang Mining Co., LTD, on the basis of summary of working face installation process, by means of optimization and improvement, has gradually formed a set of safe, fast and effcient installation process of fully mechanized working face of large mining height, which not only saves the installation time, but also reduces the cost of installation.
出处
《山东煤炭科技》
2018年第1期24-26,共3页
Shandong Coal Science and Technology
关键词
大采高
综采
安装
large mining height
fully mechanized
installation