文章针对临汾市人民医院迁建项目降水工程,介绍了工程方案的优选过程,通过计算确定了降水布井的数量,并从材料的选择和招标、施工过程的科学管理、工程款的支付这3个方面详细阐述了在降水工程中控制造价的具体做法,总结了该工程实施后的效果。
According to the dewatering project of Linfen People’s Hospital relocation project,the article introduces the optimization process of engineering scheme,the quantity of dewatering wells is determined by calculation;elaborates the concrete practice of controlling the cost in the dewatering project form three aspects:material selection and bidding,the scientific management of construction process,payment of construction funds;and summarizes the effect after the project is implemented.