中国AP1000的人因工程安全审评的几个问题

Several Issues in Safety Review of Human Factors Engineering in Chinese AP1000 Nuclear Power Plant
下载PDF
导出
摘要 第一座AP1000核电厂建造于中国的浙江省三门县。人因工程原则应用于核电厂控制室设计以及于全厂设计。本文依据法规标准对三门核电厂的人因工程进行了审评。本文介绍了审评过程中的几个重要问题。主要是主控室设计(包括环境和布局),背景噪声,主控室温升的设计变更,集成系统确认和人因工程偏差项。 The first API000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China. Human factors engineering disciplines are applied to the design. Human factor engineering includes these elements : human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human perform-ance monitoring , the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces several important issues during the reviewing. The issues emphasize on the main control room design (including environment and layout) , background noise in the actual main control room may exceed too much to design value, the design change proposal about main control room habitability systems (VES) changes to satisfy post-actuation performance require-ments, integrated system validation, and human engineering discrepancy (HED)
出处 《核安全》 2017年第4期22-28,共7页 Nuclear Safety
关键词 人因工程 安全审评 验证和确认 主控室(MCR) 集成系统确认(ISV) 人因工程偏差项(HED) human factor engineering safety review verification and validation main control room integrated system validation human engineering discrepancy
  • 相关文献

参考文献4

二级参考文献29

  • 1Westinghouse. AP1000 design control document [EB/OL]. [ 2009 -11 -29 ]. http: //www. chinanue lear. cn/bbs/showthread, php? s = 11 f6216eO58fdc9ase568e5c6105t9762t = 118608.
  • 2US NRC. DI&C-ISG-01 Interim staff guidance on digital instrumentation and control[S]. 2007.
  • 3US NRC. DI&C-ISG-02 Interim staff guidance on diversity and defense-in-depth issues[S]. 2007.
  • 4US NRC. DI&C-ISG-03 Interim staff guidance on review of new reactor digital instrumentation and control probabilistic risk assessments [S]. 2008.
  • 5US NRC. DI&C-ISG-04 Interim staff guidance on highly-integrated control rooms-communications issues (HICRc) [S]. 2007.
  • 6US NRC. DI&C-ISG-05 Interim staff guidance on highly-integrated control rooms-human factors issues (HICR-HF) [S]. 2007.
  • 7HAF J0055-1995核电厂控制室设计的人因工程原则[S].
  • 8J. O' Hara, J. Higgins, et al. NUREG-0711, Human Factors Engineering Program Review Model[S]. Washington D.C.: U.S. Nuclear Regulatory Commission, Feb. 2004, Rev.2.
  • 9J. O' Hara, W. Stubler, et al. NUREG/CR- 6393, Integrated system validation: Methodology and review criteria[S]. Washington D.C. : U .S. Nuclear Regulatory Commission, Sep. 1995.
  • 10IEC 61771, Nuclear Power Piants Main Control Room Verification and Validation of Design [S]. Switzerland : International Electrotechnical Commission, Dec. 1995.

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部