有限元在悬浇挂篮结构计算中的应用 被引量:4

APPLICATION OF FINITE ELEMENT METHOD IN STRUCTURAL CALCULATION OF HANGING BASKET
下载PDF
导出
摘要 小绥芬河特大桥连续梁桥采用(40+64+40)m三跨预应力混凝土箱梁,箱梁2#~7#块采用挂篮悬臂浇筑的方法进行施工,为保证施工期间挂篮能够安全工作,重点对挂篮的主要构件进行了计算分析,采用传统力学方法与有限元方法相结合解决了该挂篮相关构件的计算问题,计算结果表明,挂篮结构的主要构件均能够保证安全工作。 the Suifenhe bridge of continuous girder bridge with(40+64+40) m three span prestressed concrete box girder,box girder 2~# ~7~# block by means of the hanging basket cantilever construction,to ensure the construction period of the hanging basket can work safety,In this paper,the main components of the hanging basket are calculated and analyzed,and the traditional mechanical method and the finite element method are combined to solve the calculation of the related components of the hanging basket,the calculation results show that the main components of the hanging basket structure can ensure the safety of work.
出处 《低温建筑技术》 2018年第1期56-59,共4页 Low Temperature Architecture Technology
基金 安阳工学院2017-2018学年大学生科技创新项目 安阳工学院2017年度校青年科研基金项目(QJJ2017011)
关键词 连续梁桥 挂篮 计算 有限元 continuous girder bridge hanging basket calculation finite element method
  • 相关文献

参考文献4

二级参考文献13

共引文献18

同被引文献27

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部