摘要
华润温州工程是一项极具代表性的维护工程项目。该航道、港池易受到台风影响,且回淤比较严重。本工程的土质原因造成航道、港池易产生浮泥层,并不易沉淀。因此必须分析台风期浮泥层的厚度,以便船舶针对性施工。
Huarun Wenzhou project is a very representative maintenance project. The waterway and harbor basin are easily affected by typhoon and the back silting is serious. Due to the soil quality of the project, waterways and port ponds easily produce floating mud and are not easy to sediment. Therefore, it is necessary to analyze the thickness of the mud layer during the typhoon so that the ship can be targeted for construction.
出处
《价值工程》
2018年第6期216-217,共2页
Value Engineering
关键词
华润温州电厂
“纳沙”台风
浮泥层
音叉
回淤量
Huarun Wenzhou Power Plant
NESAT typhoon
floating mud layer
tuning fork
back silt