摘要
通过对废弃桩拔桩过程及拔桩后产生的影响进行分析,从拔桩的顺序,拔桩对周围土体的影响,水泥土回填以及桩的回收利用等方面进行论述,引发了一系列的思考,提出了新的研究方向,展望未来新的桩基设计理念,以缓解未来的"城市病"。
By analyzing the influence of waste pile pulling process and pile after pile from the analysis,the order of influence on the surrounding soil pile,cement soil pile and backfill recycling were discussed,triggering a series of thinking,put forward a new research direction and prospect of the new concept of the future design of pile foundation the future,in order to alleviate the"urban diseases".
出处
《山西建筑》
2018年第3期80-81,共2页
Shanxi Architecture
关键词
旧桩
拔除顺序
回收利用
old piles , extraction order, recycling