摘要
结合当前我国综采工作面的快速安装技术的相关内容,对综采工作面安装前的准备工作与综采设备快速安装技术进行具体阐述。其中,安装前的准备工作包括综采工作面开切眼的准备工作和综采设备安装前的准备工作,综采设备快速安装技术包括液压支架、采煤机、刮板输送机的快速安装。
Based on the related content of current fast installation technology of fully mechanized working face in our country, and analyzes the preparatory work and fully mechanized mining equipment installation on the fully mechanized face in front of the fast installation technology. Among them, including the preparation before installation of fully mechanized mining face cut eye preparation and the preparation of the fully mechanized mining equipment before installation, fast mining equipment including the installation technology of hydraulic support, shearer, quick installation of scraper conveyor.
出处
《机械管理开发》
2018年第1期142-143,共2页
Mechanical Management and Development
关键词
综采
工作面
快速安装技术
fully mechanized mining
working face
rapid installation technology