摘要
通过对庙沟铁矿露转井工程的概述,分析过渡期现有工程及井下施工期产生的环境影响及污染防治措施,使过渡期的环境影响降至最低。
Based on an overview of Miaogou Iron Ore about transferred underground mining from open-pit in the transition period.its impact on environment is analyzed during the transitional period and underground construction period.The adopted measurements are given to minimize the environmental impact during the transitional period.
出处
《矿业工程》
CAS
2018年第1期51-53,共3页
Mining Engineering
关键词
铁矿
露转井
过渡期
环境影响
iron ore
transferred underground mining from open-pit
transition period
environmental effect