摘要
该工艺改变了传统的综采切眼先刷扩、后安装的作业方式,将综采切眼刷扩与设备安装集成,实现两个工序同步一体化作业,工艺核心装备是滑移式临时支护装置、煤矿用挖掘式装载机及液压支架安装叉车。
By expansion and installation integration for open-off cut in fully mechanized mining face, the traditional operation mode of first expansion and then installation was changed,and synchronous operation of two processes was realized.
出处
《陕西煤炭》
2018年第1期132-133,90,共3页
Shaanxi Coal
关键词
综采工作面
扩帮安装一体化
扩帮联合机组
工艺
fully mechanized mining face
expansion and installation integration
expansion integral unit
process