基于三维地质建模的高速公路边坡数值分析 被引量:5

Numerical Analysis of Highway Slope Based on 3D Geological Modeling
下载PDF
导出
摘要 以南宁吴圩机场第二高速公路K8+720^+960左侧边坡锚杆(索)格梁支护工程为例,基于midas GTS NX软件建立该边坡的三维地质模型,对边坡开挖与支护进行了模拟。计算中采用摩尔-库仑弹塑性模型,编制程序实现锚杆与格梁间的链接,通过数值模拟与实测数据对比,详细分析了该边坡开挖沉降规律、边坡周围岩体的水平位移特征、边坡剪应变特征及塑性区分布特征,验证了此次三维数值分析结果的合理性。 Taking the anchor bolt (cable) lattice beam supporting along the left bank slope in K8 + 720 +960 section of the second highway for Nanning Wuxu Airport as an example, 3D geological model of this slope was established with midas GTS NX software to simulate the slope excavation and support, during which Moore-Coulomb elastic-plastic model was used, and the link between the anchor bolt and lattice beam was implemented by programming. Next, through the comparison between numerical simulation and field measurements, the settlement rules in slope excavation, the characteristics of horizontal rock displacement surrounded, the characteristics of shear strain of slope and the features of plastic zone distribution, were analyzed in details, thereby, the rationality of the result from the 3D numerical analysis herein was verified.
出处 《路基工程》 2018年第1期52-55,共4页 Subgrade Engineering
关键词 边坡开挖 锚杆(索)格梁支护 数值模拟 沉降变形 剪应变 塑性区 slope excavation anchor bolt (cable) lattice beam supporting numerical sumulation settlementdetormation shear strain plastic zone
  • 相关文献

参考文献4

二级参考文献30

  • 1程良奎.岩土锚固研究与新进展[J].岩石力学与工程学报,2005,24(21):3803-3811. 被引量:143
  • 2孔德森,栾茂田.岩土力学数值分析方法研究[J].岩土工程技术,2005,19(5):249-253. 被引量:18
  • 3龚文惠,王平.顺层岩体路堑边坡稳定性的弹塑性有限元模拟分析[J].岩土力学,2006,27(7):1114-1118. 被引量:18
  • 4GB50330-2002.建筑边坡工程技术规范[S].[S].北京:中国建筑工业出版社,2002..
  • 5Ostermayer H,Scheele F.Research and ground anchors in non-cohesive soils[J].Geotechnique,1977(3):92-97.
  • 6Briaud B J,Powers W F,Weatherby D E.Should ground anchors have short tendon bond length?[J].Journal of Geotechnical and Geoenvironmental Engineering,1998,124(2):110-119.
  • 7Barley A D.The single bore multiple anchor system[C]//Proc Int Conf:Ground Anchorages and Anchored Structures.London,1995:65-75.
  • 8孙书伟,杨胜利,郑波,等.分体式全长注浆锚固设施:中国,201310700660.6[P].2013-12-19.
  • 9Barley A D,Windsor C R.Recent advances in ground anchor and grout reinforcement technology with reference to the development of the art[C]//Int Conf on Geotechnical and Geological Engineering.Melbourne,2000:1083-1094.
  • 10Itasca.Fast lagrangian analysis of continua in 3 dimensions[M].Minnespolis:Itasca Consulting Group Inc,2005.

共引文献6

同被引文献39

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部