摘要
针对王坡煤矿3212工作面瓦斯含量较高的实际情况,利用立体交叉钻孔进行了强化预抽煤层瓦斯现场试验,并对工作面抽采钻孔布孔均匀程度以及工作面首采0~770 m瓦斯抽采达标情况进行了评价分析。结果表明:立体交叉钻孔强化预抽煤层瓦斯在3212工作面取得了良好的瓦斯抽采效果,是煤与瓦斯突出矿井有效的消突方法之一。
Aiming at the actual situation of high gas content in 3212 working face of Wangpo coal mine, the stereo cross drilling was used to strengthen the pre-drainage gas. The drilling hole uniformity degree and the condition of 0~770 m gas extraction in the working face were evaluated and analyzed.The results show that the stereo cross drilling to pre-drainage coal seam has achieved good gas extraction effect in the 3212 working face, which is one of the effective methods to eliminate coal and gas outburst.
出处
《煤炭技术》
CAS
2018年第2期204-205,共2页
Coal Technology
基金
"十二五"国家科技重大专项课题(2011ZX05041-004)
关键词
突出矿井
工作面
立体交叉钻孔
瓦斯抽采
抽采达标
outburst mine
working face
stereo cross drilling
gas extraction
pumping standard