6SIMPSON A L,RAUHUT J B,JORDAHL P R,et al. Early a-nalysis of LTPP general pavement studies data (Volume E ):Sensitivity analyses for selected pavement distresses (ReportSHRP-P-393)[R], Washington, D C:National Research Coun-cil,1994.
7YU H T, SMITH K D, DARTER M I,et al. Performance ofconcrete pavements( Volume ffi ) : Improving concrete pavementperformance(FHWA~RD-95-lll) [R]. Washington, D C: Fed-eral Highway Administration, 1997.
8HOERNER T E, DARTER M I, KHAZANOVICH L,et al.Improved prediction model for PCC pavement performance-re-lated specifications ( Final report) ( FHWA-RD -00-130 ) [R].Washington, D C:Federal Highway Administration,2000.
9HOERNER T E,TARR S M, DARTER M I,et al. Guide todeveloping performance-related specifications for PCC pave-ments( Volume ):Appendixes C through F( FHWA-RD-98-171) [R]. Washington, D C: Federal Highway Administra-tion, 1999.
10PESHKIN D G, HOERNER T E,ZIMMERMAN K A. Opti-mal timing of pavement preventive maintenance treatment ap-plications(NCHRP report 523)[R], Washington, D C: Trans-portation Research Board,2004.