期刊文献+

模糊综合评价方法在水利水电工程质量评价中的应用 被引量:3

Application of Fuzzy Comprehensive Evaluation Method in Water Conservancy and Hydropower Project Quality Evaluation
下载PDF
导出
摘要 模糊综合评价法昰一种评估不确定研究对象的重要方法,以定量化表达形式刻画研究对象,挖掘研究对象中的隐藏信息,评估研究对象隶属于不同评价结果的隶属度。水利水电工程质量评价是水利水电工程验收的重要环节,文章以模糊综合评价方法为研究方法,将其应用于水利水电工程质量评价中,可定量、有效地评估水利水电工程的质量。 Fuzzy comprehensive evaluation method is an important method to evaluate uncertain research objects,and to depict the research object in quantification express type,and to dig into hidden information of research objects,so as to assess the membership of research objects belonging to various evaluation results. The quality evaluation of water conservancy and hydropower project is a vital link to check out the water conservancy and hydropower projects,this paper adopts the fuzzy comprehensive evaluation method as the research method and applies it to evaluate the quality of water conservancy and hydropower project, and it can assess the quality of water conservancy and hydropower project quantitatively and effectively.
作者 谢锐
出处 《黑龙江水利科技》 2017年第11期148-151,共4页 Heilongjiang Hydraulic Science and Technology
关键词 水利水电工程 质量评价 模糊综合评价法 water conservancy and hydropower project quality evaluation fuzzy comprehensive evaluation method
  • 相关文献

二级参考文献15

共引文献35

同被引文献10

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部