深厚淤泥质河床管廊过河双钢板桩围堰施工技术研究 被引量:2

Study on Double Steel Sheet Pile Cofferdam Construction Technology of Utility Tunnel Crossing Deep Silty Riverbed
下载PDF
导出
摘要 综合管廊是今后大力发展的地下市政工程布局,而现浇法是最主要的一种施工形式。以嘉兴科技城项目为例,对深厚淤泥质河床管廊过河双钢板桩围堰施工技术进行探讨,从围堰结构设计、淤泥质河床基底注浆处理和围堰内壁掺灰土填芯技术进行了详细分析,可为类似工程提供参考。 The utility tunnel is the underground municipal engineering layout energetically to develop in the future,and the cast-in-site process is the most main construction form.Taking the Jiaxing Technology City Project as an example,the article discusses the double steel sheet pile cofferdam construction technology of utility tunnel crossing deep silty riverbed,and analyzes the cofferdam structure design,the silty riverbed base grouting treatment and the cofferdam inwall lime-added soil filling core technique in detail,which can be referred for the similar projects.
出处 《城市道桥与防洪》 2018年第2期133-135,共3页 Urban Roads Bridges & Flood Control
关键词 管廊现浇 钢板桩围堰 注浆 掺灰土填芯 cast-in-site utility tunnel steel sheet pile cofferdam grouting lime-added soil filling core
  • 相关文献

二级参考文献4

  • 1总参工程兵科研三所.GB50108--2008地下工程防水技术规范[S].北京:中国计划出版社,2008.
  • 2.上海市政工程设计研究总院(集团)有限公司,同济大学.GB50838--2015城市综合管廊工程技术规范[s].北京:中国计划出版社,2015.
  • 3北京城建设计研究总院有限责任公司,中国地铁工程咨询有限责任公司.C.B50157--2013地铁设计规范[s].北京:中国建筑工业出版社,2013.
  • 4电力规划设计总院.DIZI5484--2013电力电缆隧道设计规程[S].北京:中国计划出版社,2013.

共引文献31

同被引文献5

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部