本文以红石电站为主要研究对象,考虑白山混合式抽水蓄能电站建设前后对于红石电站水能利用提高率影响为目标,采用白山混合式抽水蓄能电站投产时间点为分界线,分别选择两个阶段的丰水年、平水年和枯水年3个典型年,对下游红石电站水能利用提高率的影响进行分析、对比、计算,得出了白山混合式抽水蓄能电站建成后,可以有效提高红石电站水能利用提高率的结论。
The article is focused on the impact of the waterpower utilization rate of the Hongshi Hydropower Station, which is impact by the Baishan Mixed Pumped Storage Power Station. Based on the production of Baishan Mixed Pumped Storage Power Station, it was divided into two stages, for each stage, high, normal, and low flow years was selected as the typical years. Through analysis and compared the waterpower utilization rate of the Hongshi Hydropower Station,it proved that the Baishan Mixed Pumped Storage Power Station can effectively improve the waterpower utilization rate of the Hongshi Hydropower Station.