邻近既有线厚垃圾层条件下组合支架设计关键技术 被引量:1

Key Technology of Combined Bracket Design under Deep Junk Layer near the Existing Line
下载PDF
导出
摘要 基于对传统支架体系的分析,针对邻近既有线、地基承载力差、支撑吨位大等现场问题优化出一种组合支架支撑体系,解决了复杂条件下高速铁路现浇连续梁支架设计的技术难题,并利用有限元对该支架体系进行可行性分析,对施工控制难点进行了简析,确保了不利地质条件下转体桥临近既有线施工安全及转体后的成桥线形。 Based on the traditional support system analysis,a combined support system is optimized for the field problems such as the nearby existing line,the foundation bearing capacity,the large support tonnage and so on,which solves the technical problems of the design of the cast-in-place beam in the high-speed railway under the complicated condition.And the support system feasibility is analyzed by finite element method,after a brief analysis of the construction control difficulties,the construction safety of the rotating bridge near the existing railway under the unfavorable geological conditions and the bridge alignment after the rotation are ensured.
出处 《交通科技》 2018年第1期41-43,47,共4页 Transportation Science & Technology
基金 中建三局集团有限公司科研项目(CSCEC3B-2016-11)资助
关键词 高速铁路 深厚垃圾层 现浇连续梁 支架设计 high-speed railway deep junk layer cast-in-place continuous beam support system de sign
  • 相关文献

参考文献5

二级参考文献17

  • 1陈列,徐公望.高墩大跨预应力混凝土桥桥式方案及合龙顺序选择[J].桥梁建设,2005,35(1):33-35. 被引量:38
  • 2周鑫,张雪松,向中富.悬臂施工连续梁桥合拢方案的讨论[J].公路交通技术,2006,22(4):96-98. 被引量:39
  • 3中交公路规划设计院.JTGD61-2005公路圬工桥涵设计规范[S].北京:人民交通出版社,2005.
  • 4JGJ162-2008建筑施工模板安全技术规范[S].北京:中国建筑工业出版社,2008.
  • 5王智.大跨度跨线现浇连续箱梁支架设计[J].交通科技,2007,17(4):18-21. 被引量:6
  • 6JTGD62--2004公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,2005.
  • 7中铁三局集团有限公司.TBl0203--2002铁路桥涵施工规范[S].北京:中国铁道出版社,2002.
  • 8范立础.预应力混凝土连续梁桥[M].北京:人民交通出版社,1999.253-261.
  • 9黄绍金,刘陌生.装配式公路钢桥多用途使用手册[M].北京:人民交通出版社,2001.
  • 10GB50017--2003钢结构设计规范[S].北京:中国计划出版社,2003.

共引文献61

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部