依据目前煤改气过程中部分客户受多种因素影响无法接通管道天然气的状况,以项目开发和建设管理的经验,介绍了建设LNG气化站和CNG减压站点供项目的解决办法。说明了作为管道铺设补充的点供项目的分类;根据客户对气源质量的要求、客户距离和场地所属、用气量以及设备投资等因素,提出了点供项目工艺的选取原则;依据工业用户和居民用户的不同,提出了点供客户的开发原则;根据相关政策、供气计划、计量、结算、安全管理以及检定等因素,提出了项目的建设和运营管理的建议。
According to the fact that some customers are unable to connect the natural gas( NG) pipeline under the influence of many factors during the process of replacement of coal by natural gas,a solution for building LNG regasification station and CNG decompression station is proposed. The concept and classification of natural gas offline supply projects are introduced. Base on the customer requirements for NG quality,distance to custom,custom site,NG consumption,equipment investment and other factors,the selection principle of processes for offline supply project is put forward. On the basis of the differences of industrial and civil users,the principle for customer development is presented. According to relevant policies,NG supply plan, measurement, settlement, safety management and verification,the suggestions for the project construction and operation management are proposed,providing a reference for the construction and operation management of the offline supply project.
出处
《石油库与加油站》
2018年第1期5-7,共3页
Oil Depot And Gas Station
关键词
天然气
加气站
点供项目
开发原则
建设运营管理建议
natural gas
gas refueling station
offline supply project
development principle
construction
operation management
suggestion