摘要
国内某大型国际枢纽机场停车楼进、出口的运行可靠性不仅关乎旅客能否顺利抵、离机场,还对停车楼的经营收益产生一定影响。论文对该枢纽机场停车楼进、出口现有的供配电系统存在的不足进行了分析,提出一种从供、用电两侧同时考虑的供配电系统改造方案,该方案相比于仅从电源侧进行改造,能够大幅提升停车楼进、出口通道的运行可靠性。
The operational reliability of the entrance and exit of a large domestic international hub airport is not only related to whether the passengers can arrive and leave the airport smoothly, but also has a certain impact on the operating revenue of the parking lot. The paper analyzes the shortage of the existing power supply and distribution system of the entrance and exit of the hub airport parking building, and puts forward a power supply and distribution system transformation scheme based on the consideration of the supply side and electricity side. Compared to the only transformation of the power supply side, the scheme can greatly improve the operational reliability of the entrance and exit passages of the parking building,
作者
刘畅
姜雪晶
金鑫
沈健
LIU Chang;JIANG Xue-jing;JIN Xin;SHEN Jian(Construction Commandof Beijing New Airport,Beijing Capital International Airport Co.Ltd)
出处
《中小企业管理与科技》
2018年第5期191-193,共3页
Management & Technology of SME
关键词
供配电系统
停车楼
可靠性
改造
power supply and distribution system
parking building
reliability
transformation