期刊文献+

综采工作面采煤机安装工艺优化探析 被引量:7

Optimization of the Installation Process of Coal Mining Machine in Fully Mechanized Mining Face
下载PDF
导出
摘要 综采工作面采煤机安装是一项相对复杂的工序,在安装过程中若不采取安全快速的安装方法,不仅影响采煤机安装质量,而且很容易发生煤矿安全事故。本文以塔山矿8205工作面为例,分析了综采工作面传统的采煤机安装工艺存在缺点,并对传统采煤机安装工艺进行优化,力求保证采煤机安全快速安装。 The installation of the coal mining machine in the fully mechanized working face is a relatively complex process, if during the installation process, safe fast installation method is not adopted, it will not only influence the installation quality of the coal minning machine,but it's also easy to cause coal mine safety accidents. In the paper, the author takes 8205 working face of Tashan Coal Mine as an example, expounds the defects the traditional mining machine installation of fully mechanized working face, and optimizes the traditional coat minning machine installation process, which ensure the safety of coal mining machine installation.
作者 张彩峰
出处 《山东煤炭科技》 2018年第2期49-50,55,共3页 Shandong Coal Science and Technology
关键词 采煤机 安装 工艺 coal mining machine installation process
  • 相关文献

参考文献2

共引文献17

同被引文献29

引证文献7

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部