摘要
整合矿井大部分地处山丘,建矿时不但要考虑生产系统简单化、投资最少化、工期最短化,更是要消除地势险情。为减少矿井工程量,降低投资成本,地面矿建充分考虑采用矿井现有井筒,对地面建设因地制宜地选取最佳方案,以下是方案的具体内容。
s: Most of the integration of the mine is located in the hills, not only to consider the production system to simplify the production system, the minimum investment, the shortest period of time, it is necessary to eliminate the dangerous terrain. In order to reduce the cost of the mine and reduce the cost of investment, the construction of the surface mine fully consider the use of the existing mine shaft, the ground construction to local conditions to select the best program, the following is the specific content of the program.
出处
《山东煤炭科技》
2018年第2期176-177,共2页
Shandong Coal Science and Technology
关键词
整合煤矿
地面建设
方案选定
integration of coal mines ground construction program selection