明挖法地铁车站施工测量控制与实施 被引量:2

Construction survey control and implementation of open-cut metro station
下载PDF
导出
摘要 以深圳地铁七号线皇岗村车站为专业背景,结合实际施工经验,主要介绍典型明挖法地铁车站施工测量控制方法与控制措施,对车站施工重点、难点及测量控制要点进行了分析,侧重实践与应用,对同类车站施工具有较强的参考性。 In this paper, the Huanggang Village Station of Metro Line 7 in Shenzhen was taken as the professional background, combined with actual construction experience, the construction survey control method and control measures of open - cut subway station were mainly introduced. Also, the Key points and difficulties in station construction, the main points of survey control were analyzed, the focuses are on practice and application, which give strong reference for similar construction projects.
作者 王登平
出处 《工程建设》 2018年第1期72-77,共6页 Engineering Construction
关键词 地铁车站 测量控制 实施措施 变形监测 subway station construction survey implementation measures deformation monitoring