高填方路基下穿燃气管道的拱涵结构及减载措施研究 被引量:2

Research on Arch Culvert Structure and Load Shedding Measures for Gas Pipeline under High Fill Subgrade
原文传递
导出
摘要 广州增城沙庄~花都北兴公路二期工程,既有燃气管道斜交并下穿待建高速公路高填方路基,拟采用拱涵保护结构。文中利用有限元软件ABAQUS数值模拟,基于摩尔库伦本构模型,以管道底部土层应力状态和拱体内力作为控制指标,研究了高填方路基下穿管道的拱涵结构工程的影响因素。结果表明,增加拱的厚度、增大基坑开挖深度,减小拱的跨度及净高,可以有效提高工程保护效果。提出了拱的厚度0.5m、跨度3.5m、净高1.0m,基坑开挖深度5.0m的方案,结合柔性填料的减载方法,有效地保护了管道及原箱涵的安全。 For the Phase Two Project of the Shazhuang of Zengcheng to Beixing of Huadu Highway in Guangzhou,the existing gas pipelines skew with and under pass the high-fill embankment of a proposed expressway,as such the arch culvert protection structure is proposed to be used. In this paper based on Mole-Coulomp constitutive model and through numerical simulations by finite element software ABAQUS, the stress state of soil under the pipe and the internal force of arch being the control index,the influencing factors of the protective effect of arch culvert structure engineering in pipeline under high embankment are studied. The results show that increase the thickness of the arch and the excavation depth, and decrease the arch's span and height can effectively improve the protection effect. And the protection scheme is proposed to effectively protect the safety of pipeline and exiting box culvert combining with the load reduction method of flexible packing,which is with 0.5m arch thickness,3.5m span length,1.0m net height is 1.0m and 5.0m excavation depth.
出处 《公路》 北大核心 2018年第2期45-51,共7页 Highway
基金 国家自然科学基金资助项目,项目编号51078151
关键词 高填方路基 拱涵 燃气管道 ABAQUS数值模拟 减载 high fill embankment arch culvert gas pipeline ABAQUS numerical simulation load shedding
  • 相关文献

参考文献6

二级参考文献19

共引文献111

同被引文献6

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部