摘要 通过对中广核如东150 MW海上风电场示范项目超大型钢管桩的沉设施工,对沉桩垂直度监测技术进行探讨与实践,采取了"高精度数显水平尺进行粗调,全站仪进行精调"的监测技术及合理有效的控制措施,确保了沉桩垂直度达到设计要求,同时为实现无过渡段法兰式单桩的沉设提供了施工技术保障。 According to the sinking construction of the oversize steel pipe piles in CGNPC Rudong 150 MW offshore wind farmdemonstration project, we discussed and applied the verticality monitoring technology of pile sinking, adopted the monitoringtechnology of "high precision digital display horizontal ruler for coarse adjustment, total station instrument for fine tune" andeffective control measures, to ensure the verticality of pile sinking can meet the design requirements. It provides the construction technology guarantee for the construction of the no-transition section flange single pile foundation.
作者 邹天城 刘星
出处 《中国港湾建设》 2018年第2期35-38,共4页 China Harbour Engineering
关键词 海上风电 单桩基础 沉桩 垂直度 offshore wind power single pile foundation pile sinking verticality
  • 相关文献

同被引文献98

引证文献22

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部