港珠澳大桥沉管隧道最终接头吊装解析 被引量:13

Analysis of hoisting of the immersed tunnel closure joint of Hongkong-Zhuhai-Macao island and tunnel project
下载PDF
导出
摘要 港珠澳大桥沉管隧道最终接头重量超过6 000 t,采用12 000 t浮吊安装,是国内最大的一次吊装作业。其安装作业的一个关键问题是了解最终接头进入龙口后沿隧道轴向的运动幅度,进而判断碰撞的可能性。基于对工程海况、施工工艺方案的认知,通过单摆公式与船舶动力学公式的结合,推导了吊装过程最终接头的动位移幅值的理论解。计算结果与实际作业观测结果较符合。 The closure joint of HZMB island and tunnel project weighs over 6 000 t, and its hoisting process is carried out by a12 000 t crane ship, which is the largest hoisting operation in China. A critical problem for its installation is to understand theaxial movement of the closure joint along the tunnel when the closure joint structure is lowered down into the slot, and then tojudge the likelihood of collision between the closure joint and the adjacent tunnel elements. Based on the cognition of marinecondition and construction method, we deduced analytical results of the maximum displacement of the closure joint during installation into the slot, by means of the combined use of equation of simple pendulum and ship dynamics. The results is in goodagreement with the observations of the actual operation works.
出处 《中国港湾建设》 2018年第2期53-60,共8页 China Harbour Engineering
关键词 沉管隧道 港珠澳大桥 最终接头 吊装 单摆公式 动力学 系泊计算 immersed tunnel Hongkong-Zhuhai-Macao Bridge closure joint hoisting simple pendulum formula dynamics mooring calculation
  • 相关文献

参考文献7

二级参考文献32

共引文献68

同被引文献163

引证文献13

二级引证文献119

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部