期刊文献+

悬索桥主缆PPWS法架设中质量通病及解决措施 被引量:4

Common Quality Problems in Erection of Main Cable of Suspension Bridge with PPWS Method and Solving Measures
下载PDF
导出
摘要 详细介绍了悬索桥主缆PPWS法架设中常见的质量问题及处理方法。重点介绍了索股牵引过程中、入鞍与索股整形过程中、调索过程中的常见问题及施工要点,对同类桥梁建设具有重要借鉴意义。 The common quality problems and handling methods in the erection of main cable of suspension bridge with PPWS method are introduced in detail. The common problems and construction points during the period of cable strand dragging, saddle penetrating and shaping as well as adjustment of cable strand are introduced, so as to provide reference for the construction of similar bridge.
作者 张成瑞 ZHANG Cheng-rui(Jiangsu North Road & Bridge Corporation, Huai'an 223001, China)
出处 《北方交通》 2018年第2期13-16,20,共5页 Northern Communications
关键词 悬索桥 索股 架设 Suspension bridge Cable strand Erection
  • 相关文献

同被引文献19

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部