摘要
珊溪水库目前多处渗压计损坏,已无法满足大坝安全监测的需要。通过施工难度、开挖量、工期、对大坝安全的影响及投资等,对方案进行了比选,并对防渗墙的墙厚、嵌入基岩深度和基础等处理进行论证,确定合理规模尺寸,对选定方案进行优化设计。
The damage of many seepage gauges in Shanxi reservoir has been unable to meet the needs of dam safety monitoring. According to the analysis of the geological condition, the construction difficulty, excavated volume, schedule control and influence on dam safety and investment detailed comparison. Based on the demonstration of impervious wall thickness, embedding bedrock depth and foundation treatment, determine a reasonable size, to optimize the design of the selected program.