新疆呼图壁河青年渠首坝体稳定监测与分析

Dam body stability observation and analysis at Qingnian canal head in Hutubi river basin of Xinjiang
下载PDF
导出
摘要 为了解新疆呼图壁青年渠首改造后坝体稳定性,采用坝坡和深部位移监测的方法,探究坝坡和边坡体深部、滑带的位移情况及变化规律。结果表明:3个表面测点x、y、z方向的位移较小,尤其是经过5次监测后,其位移不到1 mm;4个测斜孔位移的总体变化趋势基本一致,其最大位移分别发生在距坡面9.5、12.2、5.7、12.8m处,A、B方向位移均随深度的增加而降低,但A方向变形量较B方向要大,即主要沿下游方向发展;深部位移变形量相对较小;坝体失稳的可能性极小。 In order to investigate the stability of dam body at Qingnian canal head in Hutubi river basin of Xinjang, dam slope and deep displacement monitoring was conducted to observe the displacement and change rule. The results demonstrate that displacement at three surface monitoring positions in x, y and z directions is little, less than lmm after 5 times of monitoring; the displacement at four inclined monitoring holes have a basically identical change trend, with the maximum displacement respectively occurred at depth of 9.5m, 12.2m, 5.7m and 12.8m from the slope surface; displacement decreases with the increase of depth in both direction A and B, but displacement in direction A is greater than that in direction B, indicating that displacement mainly developing along downstream direction; displacement at deep positions is relative smaller; the probability of dam instability is minimal.
作者 陈飞
出处 《广西水利水电》 2018年第1期70-73,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 土石坝 稳定 监测 Earth-rock dam stability observation
  • 相关文献

参考文献3

二级参考文献32

  • 1朱炜,马鲁铭,盛铭军.CFD模型在污水沉淀池数值模拟中的应用[J].水处理技术,2006,32(4):10-13. 被引量:14
  • 2李治勤,陈刚,杨晓池.浑水引起迷宫灌水器物理堵塞因素实验研究[J].西安理工大学学报,2006,22(4):395-398. 被引量:26
  • 3T Abdoun,V Bennett,R Dobry,S Thevanayagam,L Danisch.Full-Scale Laboratory Tests Using a Shape-Acceleration Array System. Geotechnical special publication . 2008
  • 4Hisham Mohamad,Peter J Bennett,Kenichi Soga,Assaf Kiar,Adam Pellow.DistributedOptical Fiber Strain Sensing in a Secant Piled Wall. Geotechnical Special Publication . 2007
  • 5BENNETT V,ABDOUN T,DANISCH L,et al.Unstable slope monitoring with a wireless shape acceleration array system. The 7th International Symposium on Field Measurements in Geomechanics . 2007
  • 6ABDOUN T.MEMS based real-time monitoring system for geotechnical structures. Indian Geotechnical Conference—2010 . 2010
  • 7ABDOUN T,BENNETT V,DANISCH L,et al.Real-time construction monitoring with a wireless shape-acceleration array system. Geo Congress2008 . 2008
  • 8ROLLINS K,GERBER T,CUMMINS C.Monitoring displacement vs.depth in lateral pile load tests with shape accelerometer arrays. Proceedings of the17th International Conference on Soil Mechanics and Geotechnical Engineering . 2009
  • 9李小勤,魏玉强,范新.呼图壁河渠首改建[J].新疆水利,2008(4):22-24. 被引量:3
  • 10华根福,刘焕芳,汤骅,宗全利,高先刚.沉沙池中水流流态的数值模拟[J].石河子大学学报(自然科学版),2009,27(4):482-486. 被引量:21

共引文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部