摘要
介绍了某水利枢纽设备供货进度管理措施,较好地解决了设备供货滞后问题,为枢纽工程建设提前完工奠定了坚实的基础,可供类似工程建设借鉴参考。
[ Abstract ] This paper introduces the province water conservancy equipment supply schedule management measures, to solve the problem of equipment supply lags behind, which laid a solid foundation for the project ahead of schedule, for the construction of similar proiects for reference.
出处
《建筑技术开发》
2018年第1期57-58,共2页
Building Technology Development
关键词
水利枢纽
设备
供货进度
进度管理
hydro junction
equipment
supply schedule
progress management