火力发电厂水岛设计技术经济分析 被引量:1

Technical and Economic Analysis of Water Island Design of Thermal Power Plant
下载PDF
导出
摘要 为适应新的环保及节水减排要求,降低工程造价,提高水资源综合利用率,国内新建电厂已陆续开始采用多水合一布置的"水岛"工程建设模式。"水岛"需要针对每一个电厂的具体情况,在深入研究各用水系统的详细运行方式及设计参数的基础上,完成水系统的整体设计。 In order to adapt to the new environmental protection, water-saving and emissions reduction requirements, to reduce the project cost, and to improve the comprehensive utilization of water resources, the new power plant have been adopted more hybrid "water island" layout construction mode. The "water island" design needs to be specific to each power plant, and the overall design of the water treatment system is completed based on the detailed operation and design parameters of each system.
作者 赵丽蕊 ZHAO Li-rui(Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group, Xi'an 710075, China)
出处 《电力勘测设计》 2018年第2期66-69,共4页 Electric Power Survey & Design
关键词 水岛 节水工艺 设计优化 经济分析 water Island water-saving process optimization of design economic analysis.
  • 相关文献

同被引文献12

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部