摘要
为适应新的环保及节水减排要求,降低工程造价,提高水资源综合利用率,国内新建电厂已陆续开始采用多水合一布置的"水岛"工程建设模式。"水岛"需要针对每一个电厂的具体情况,在深入研究各用水系统的详细运行方式及设计参数的基础上,完成水系统的整体设计。
In order to adapt to the new environmental protection, water-saving and emissions reduction requirements, to reduce the project cost, and to improve the comprehensive utilization of water resources, the new power plant have been adopted more hybrid "water island" layout construction mode. The "water island" design needs to be specific to each power plant, and the overall design of the water treatment system is completed based on the detailed operation and design parameters of each system.
作者
赵丽蕊
ZHAO Li-rui(Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group, Xi'an 710075, China)
出处
《电力勘测设计》
2018年第2期66-69,共4页
Electric Power Survey & Design
关键词
水岛
节水工艺
设计优化
经济分析
water Island
water-saving process
optimization of design
economic analysis.