期刊文献+

大型污水处理厂工艺模拟应用实例 被引量:5

A Case Study of Process Modelling of a Large-scale Wastewater Treatment Plant
原文传递
导出
摘要 污水厂工艺模拟(数学模型)已被广泛接受,并应用于城市污水厂的设计、升级改造和优化运行。但是,模拟中的困难和挑战是缺少可靠、高质量的数据进行污水厂模型的校准和验证,通常需要投入大量的人力和资金收集数据。另一方面,在污水厂运行管理中,为满足监管而投入大量人力和资金所获得的数据(历史监测数据)没有得到很好的利用,价值没有得到很好的挖掘。利用北京某大型污水厂两年的历史监测数据对工艺模型进行校准和验证,并应用校正后的模型为该污水厂的运行管理提供优化方案。这个实例充分发掘了历史监测数据的价值,示范性地探索了如何利用污水处理的历史监测数据进行污水处理模型校准和验证,并为污水处理厂的优化运行、升级改造提供了可靠方案。 The process modelling ( mathematical model) of wastewater treatment plant (WWTP) has been widely accepted and applied for design, retrofit, and optimization of municipal WWTP. One of the challenges in the process modelling is the lack of reliable and high-quality data for the calibration and validation of the model. Collection of the data costs considerable budget. However, the monitoring data from the operation and management of WWTP could be better utilized and the value of the dala could be further explored. This study calibrated and validated a process model using two years' monitoring data from a large wastewater treatment plant in Beijing, and provided a calibrated and optimized model for the operation and management of the wastewater treatment plant. This example fully explored the value of the historical monitoring data, demonstrated the calibration and verification of sewage treatment models using historical monitoring data, and provided a reliable plan for the optimization of the operations and the rel- rofit of wastewater treatment plants.
出处 《中国给水排水》 CAS CSCD 北大核心 2018年第5期82-87,共6页 China Water & Wastewater
关键词 污水处理厂 工艺模拟 监测数据 脱氮 wastewater treatment plant process modelling monitoring data nitrogen re-moval
  • 相关文献

参考文献4

二级参考文献18

  • 1邹敏,吴晓翔,郭燕,徐婧静,叶阳阳,陈科罕.利用BioWin软件优化某高速公路服务区的污水处理工艺[J].给水排水,2013,39(S1):260-262. 被引量:3
  • 2Head M A,Oleszkiewicz J A. Bioaugrnentation for nitrification at cold temperatures. Wat Res, 2004,38(3) : 523-520.
  • 3张自杰.废水处理理论与设计[M].北京:中国建筑工业出版社,2002..
  • 4Henze M, Gujer W, Mino T,et al. Activated sludge model No. 2[A]. IAWQ Scientific and Technical Report No. 3[R]. London:IAWQ,1995.
  • 5Henze M, Gujer W, Mino T, et al. Activated sludge model No. 2d. [ J ]. Wat Sci Tech, 1999,39 ( 1 ): 165 - 182.
  • 6Cinar O,Daiger G T,Graef S P.Evaluation of IAWQ activated sludge model No.2 using steady-state data from four scale wastewater treatment plants.Wat Env Res,1998,70:1216~1224
  • 7Dold P L,Wentzel M C,Billing A E,et al.Activated sludge simulation programs:Version 1.0 Nitrification and nitrification/denitrification systems.Gezina Water Research Commission,1991
  • 8Ekama G A,Wentzel M C.Difficulties and developments in biological nutrient removal technology and modeling.Wat Sci Tech,1999,39(6):1~11
  • 9Henze M,Grady C P L (Jr),Gujer W,et al.Activated sludge model No.1.IAWQ Scientific and Technical Report No.1,London,1987
  • 10Henze M,Gujer W,Mino T,et al.Activated sludge model No.2.IAWQ Scientific and Technical Report No.2,London,1995

共引文献52

同被引文献20

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部