安谷水电站机电工程管控坚持高标准、高效率,投产机组的振动摆度等关键运行指标大大优于国标厂标。从参建队伍管控、设计方案主导、设备招标及合同管控、设备现场管控、机电安全管控、配套工程管控等方面进行了分析和总结。
High standards and high efficiency management and control for electrical and mechanical equipment engineering is insisted on.Key operation index,such as vibration throw of commissioned units,is much better than national standard.Analysis and summaries are given in respect of construction team management,design scheme leading,equipment bidding and contract management,on-site management and control of equipment,electrical and mechanical equipment safety control,auxiliary projects management,providing references to the similar projects.
出处
《四川水力发电》
2018年第1期1-3,7,共4页
Sichuan Hydropower
关键词
院安谷水电站
机电工程
质量
效率
管控
hydropower station
electrical and mechanical equipment engineering