期刊文献+

某金矿尾矿库泄漏事故后治理与分析 被引量:2

Management and Analysis after Leakage Accident of a Gold Mine Tailings
下载PDF
导出
摘要 尾矿库的管理与设计要严格按照国家有关部门和设计院的要求执行,切不可贪图眼前利益为日后发生事故埋下隐患甚至造成不可弥补的损失。笔者的目的是想让大家通过这一整改案例吸取教训,而不是通过这一案例让人们总结经验。虽然从整改方案实施后并未再发生事故,但从严格意义角度讲这项整改方案是不成功的。 The management and design of tailings ponds should be strictly carried out in accordance with the requirements of relevant state departments and design institutes,and must not seek immediate benefits to lay hidden dangers or even cause irreparable damages to future accidents.The author's intention is to let everyone learn lessons through this rectification case,not through this case let people sum up experience.Although no accident occurred after the implementation of the rectification plan,the rectification plan was unsuccessful from a strict sense of perspective.
作者 冯煜 林青春
出处 《世界有色金属》 2017年第24期165-166,共2页 World Nonferrous Metals
关键词 尾矿库 泄漏 排水涵管 tailings pond leakage drainage culvert
  • 相关文献

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部