期刊文献+

基于无功补偿技术的南温河钨矿供电系统优化改造 被引量:2

Optimization and Transformation of Power Supply System in Nanwenhe Scheelite Mining Based on Reactive Power Compensation
下载PDF
导出
摘要 在矿山生产中使用的主扇、空压机、水泵等感性负载消耗了大量的无功功率,解决该问题的最好办法是在供电线路中增加无功补偿装置。本文结合南温河钨矿供电特性和现状,分析了供电系统存在的问题,利用无功补偿技术对该矿供电系统进行优化改造,解决了矿山供电系统安全供电和经济供电问题,推动了节能降耗和绿色矿山建设,对类似矿山具有一定的借鉴意义。 Many inductive loads in mine production consume abundant reactive power,such as main fan、air compressor、pump and so on,the best way to solve problems is adding non-power compensation device of power supply line.In view of characteristics and current status of power supply for Nanwenhe scheelite mining,problems of power supply in the mine were analysed in this paper,reactive power compensation technology was used to optimize and transform power supply system of Nanwenhe scheelite mining,which solved the security and economic issues of power supply in Nanwenhe scheelite mining power supply system and promoted energy saving and consumption reduction and green mining construction,the experience is of important guiding significance for other similar mines.
出处 《世界有色金属》 2017年第23期246-248,共3页 World Nonferrous Metals
关键词 无功补偿 功率因数 供电系统 优化改造 节能降耗 绿色矿山 reactive power compensation power factor power supply system optimization and modification energy saving and consumption reduction green mining construction
  • 相关文献

参考文献1

共引文献14

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部