摘要 为研究深基坑阳角变形归律,基于增量计算法并借助于FLAC-3D软件对基坑工程中的阳角进行有限差分数值模拟.研究结果表明:在支护结构及支护方式相同情况下,先开挖标准段后开挖端头井的方法更利于阳角稳定且阳角最大位移比原施工方案减少了约45%;发现阳角位移随钢支撑截横面积减小而呈指数型衰减的趋势,给出了类似工程钢支撑横截面积的合理参考区间0.06~0.09 m^2. Finite difference numerical simulation on the negative corner is, based on incremental calculation method, by means of FLAC^3D, conducted in order to study the negative corner deformation law of deep foundation pit. Results show that the method of end well excavation after standard segment excavation is more conducive to the stability of negative corner and the maximum displacement of negative corner is 45% less than the original construction plan under the identical condition of supporting structure and way and that displacement of positive corner presents attenuation trend with the decrease of cross sectional area of steel support and that the reasonable reference range of cross sectional area—0.06 ~ 0.09 m^2— of steel support in similar engineering is given. The research can provide reference for similar foundation pit engineering, which makes the construction of irregular foundation pit more reasonable, reliable, safer and economical.
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2017年第11期1160-1165,共6页 Journal of Liaoning Technical University (Natural Science)
基金 国家安监总局项目(0505079) 辽宁省教育厅项目(1.2011048)
关键词 深基坑 增量法 阳角 FLAC-3D 开挖方式 横截面积 deep foundation pit incremental method positive comer FLAC^3D excavation method cross section area
  • 相关文献

参考文献8

二级参考文献68

共引文献65

同被引文献10

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部