3EI. SHARKH M Y, EI. KEIB A A. An evolutionary pro- gramming-based solution methodology for power generation and transmission maintenance scheduling[J]. Electric Power Systems Research, 2003, 65 : 35-40.
4SOCHA K, ORIGO M. Ant colony optimization for continu- ous domains[J]. European Journal of Operational Research, 2008, 185: 1155-1173.
5MAY M T, VURAL A M, LO K L. The effect of unified pow- er flow controller location in power systems [ J ]. Electrical Power and Energy Systems, 2004, 26 : 561-569.
6企业职工伤亡事故分类标准[S].GB6441-1986.
7DEY P M. A risk-based model for inspection and mainte- nance of cross-country petroleum pipeline[J]. Journal o Quality in Maintenance Engineering, 2001,40(4): 24-31.
8BACKLUND F, HANNU J. Can we make maintenanc decisions on risk analysis results [J]. Journal of Quality it Maintenance Engineering, 2002,8(1) : 77-91.
9KHAN F I, HADDARA M M. Risk-based maintenanet (RBM): A quantitative approach for maintenance/inspec- tion scheduling and planning[J]. Journal of Loss Preven- tion in the Process Industries,2003,16(6): 561-573.
10BROWN S J, MAY I L. Risk-based hazardous protection and prevention by inspection and maintenance [J]. Trans. ASM[J. Press. Ves. Technol.,2003 (122):362-367.