期刊文献+

分层异构网络应急信息资源调度仿真研究 被引量:4

Simulation Research on Emergency Information Resource Scheduling of Hierarchical Heterogeneous Network
下载PDF
导出
摘要 分层异构网络应用中存在大量优先级不同的应急数据,它要求苛刻的硬实时和负载均衡性能,超过延时上限,将难以满足应急信息调度需求。常规应急信息资源调度的研究多是以单一任务最早执行完成时间为目标处理资源调度问题,缺乏可调度性,导致调度过程负载不均衡、总任务调度延迟。提出应急信息资源调度模型。确定应急信息资源全部任务相关关系和调度顺序,指定多任务资源分配优先级,建立目标模型,实现应急信息资源调度,适应度函数,指导种群收敛条件,加快调度模型求解效率,将调度负载均衡与总任务调度完成时间问题进行了集成解决。实验结果表明,该模型能够满足应急数据调度要求苛刻的硬实时和负载均衡性能。 An emergency information resource scheduling model is presented. The correlativity of total tasks of e- mergency information resources and scheduling sequence are determined. Then, the priority of multitask resource al- location is designated to establish the target model and realize emergency information resource scheduling. Moreover, the convergence condition of population is guided and the solving efficiency of scheduling model is accelerated. The scheduling load balancing and the total completion time of task scheduling problems are solved integratively. Simula- tion results prove that the proposed model can satisfy the requirement of emergency data scheduling, the severe hard real -time and load balancing performance.
出处 《计算机仿真》 北大核心 2018年第2期417-420,共4页 Computer Simulation
关键词 分层异构网络 应急信息 资源调度 Hierarchical heterogeneous network Emergency information Resource scheduling
  • 相关文献

参考文献10

二级参考文献118

  • 1余谦,王先甲.基于粒子群优化求解纳什均衡的演化算法[J].武汉大学学报(理学版),2006,52(1):25-29. 被引量:36
  • 2潘郁,余佳,达庆利.基于粒子群算法的连续性消耗应急资源调度[J].系统工程学报,2007,22(5):556-560. 被引量:60
  • 3ENGELBRECHTAP.计算智能导论[M].谭营,译.2版.北京:清华大学出版社,2010:3-313.
  • 4DEMEULEMESSTER E L,HERROELEN W S.A branchand-bound procedure for the multiple resource-constrained project scheduling problem[J].Management Science,1992,38(12):1803-1818.
  • 5TYSON B,ALI Y.Resource-constrained multi-project scheduling:priority rule performance revisited[J].International Journal of Production Economics,2010,126(2):212-228.
  • 6HARTMANN S.A self-adapting genetic algorithm for project scheduling under resource constraints[J].Naval Research Logistics,2005,49(5):433-448.
  • 7DE BOER R.Resource-constrained multi-project management,a hierarchical decision support system[D].Enschede,the Netherlands:University of Twente,1998.
  • 8ZHANG Z,CHN J.Solving the spatial scheduling problem:a two-stage approach[J].International Journal of Production Research,2012,50(10):2732-2743.
  • 9KOH S,LOGENDRAN R,CHOI D,et al.Spatial scheduling for shape-changing mega-blocks in a ship building company[J].International Journal of Production Research,2011,49(23):7135-7149.
  • 10ZHENG Junli,JIANG Zhibin,CHEN Qiang,et al.Spatial scheduling algorithm minimizing makespan at block assembly shop in shipbuilding[J].International Journal of Production Research,2011,49(23): 2351-2371.

共引文献123

同被引文献43

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部