摘要
本文阐述了在基坑工程中以组合型钢作为钢骨的混凝土斜撑的关键施工工艺,因地制宜地采用合理吊装和拆除方案,加快施工进度,实现绿色施工的目的。
This paper discusses the key construction technology of steel encased concrete diagonal braces with built-up shape in pit engineering,in the light of local station,hoisting scheme and demolishing scheme were reasonably selected,which speeded up the construction progress and achieved the target of economical and environmentally friendly construction.
出处
《广东土木与建筑》
2017年第5期47-49,共3页
Guangdong Architecture Civil Engineering
关键词
钢骨混凝土
斜撑
吊装拆卸
steel encased concrete
diagonal braces
hoisting and demolishing