期刊文献+

建筑信息模型的发展路线及一体化项目交付 被引量:12

BIM DEVELOPMENT ROUTE AND INTEGRATED PROJECT DELIVERY
原文传递
导出
摘要 通过介绍建筑信息模型(BIM)的相关概念和国内外BIM成熟度模型和发展路线的理论,探讨BIM应用发展的最终目标以及一体化项目交付(IPD)的内涵,并对于我国BIM应用现状和国内外IPD应用现状、阻碍因素和相关案例进行了综述和分析。在此基础上,对我国BIM和IPD应用研究中的不足之处进行探讨并提出改进建议,对如何推广IPD给出了建议。 The paper presented a comprehensive review of key concepts,maturity models and development route of Building Information Modelling( BIM) at home and abroad,the ultimate goal of BIM application development and the connotation of integrated project delivery( IPD) were also discussed. The state of practice of BIM in China was reviewed,followed by the analysis of two IPD cases in China and USA respectively. On this basis,the shortcomings of the research on BIM and IPD applications in China were discussed,and some suggestions on IPD promotion were put forward.
作者 高崧 李卫东
出处 《工业建筑》 CSCD 北大核心 2018年第2期8-15,共8页 Industrial Construction
关键词 一体化项目交付 建筑信息模拟 BIM成熟度模型 发展路线 Integrated Project Delivery ( IPD ) Building Information Modelling ( BIM ) BIM maturity model development route
  • 相关文献

参考文献16

二级参考文献119

  • 1籍成科,郑倬华.杭州奥体博览城主体育场设计——参数化设计方法在体育建筑中的应用[J].建筑技艺,2011(1):68-73. 被引量:8
  • 2詹伟,邱菀华.项目管理成熟度模型及其应用研究[J].北京航空航天大学学报(社会科学版),2007,20(1):18-21. 被引量:26
  • 3刘安业,王要武.基于建筑供应链的物流资源整合研究[J].哈尔滨工业大学学报(社会科学版),2007,9(4):121-124. 被引量:7
  • 4Feniosky Pena-Mora, Michael Li. Dynamic planning and control methodology for design/build fast-track construction projects [ J ]. Journal of Construction Engineering and Management, 2001, 127 (1): 1-17.
  • 5George Elvin. Integrated practice in architecture: Mastering design-build, fast- track, and building information modeling [M]. New Jersey: John Wiley and Sons, 2007.
  • 6AIA Nation/AIA California Council. Integrated project delivery: a guide [M/OL]. Washington: The American Institute of Architects, 2007 [2010-10-30]. http: //www. betterbricks. com/ graphics/assets/documents/AIA-_ IPD_ Guide 2007. pdf.
  • 7David C Kent, Burcin Becerik-Gerber. Understanding construction industry experience and attitudes toward integrated project delivery [ J ]. Journal of Construction Engineering and Management, 2010, 136 (8): 815-825.
  • 8Gregory A Howell. What is lean construction [ C]//Iris D Tommelein, Glenn Ballard. Proceedings of the 7th annual conference of the International Group for Lean Construction. Berkeley: IGLC-7, 1999.
  • 9Patrick J OConnor. Integrated project delivery: collaboration through new contract forms [ M/OL ]. Minneapolis: Faegre & Benson LLP, 2009 [2010-10-30]. http: //www. faegre. com/webfiles/AGC- IPD% 20Paper. pdf.
  • 10Jonathan Cohen. Integrated Project Delivery: Case Studies [M/OL]. Sacramento: AIA California Council, 2010 [ 2010- 10- 30 ]. http: //www. klingstubbins, com/about/ pdfs_ articles/Jan_ 01_ 10_ AIA IPD% 20CaseStudies_ Autodesk. pdf.

共引文献478

同被引文献115

引证文献12

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部