摘要
文章通过常州市文化广场(二期)剪力墙预应力施工实例,介绍了竖向构件有粘接和无粘接相结合预应力的施工方法,为类似项目的施工提供一些借鉴与参考。
In this paper, due to the construction example of shear wall prestressed concrete wall of Changzhou Cultural Square(Phase II), the construction method of vertical component with bonded and non-bonded prestressed is introduced, which can provide some references for the construction of similar projects.
出处
《江苏建筑》
2017年第B12期31-33,51,共4页
Jiangsu Construction
关键词
预应力
竖向结构
有粘接
无粘接
后穿法
prestress
vertical structure
bonding
non bonding
post threading method