摘要
工程主体结构顶面标高为280.9m,地上建筑楼层数58F,外围墙体由1300㎜变至500㎜,最大一次变化100㎜。本工程共布置56榀重型爬模机位,自带全钢大模板,主要用于核心筒外侧墙体28榀机位,筒内布置28榀机位,核心筒内其它位置采用散支体系木模滞后施工。
he main structure of the project top elevation is 280.9 M, the ground floor of building is 58 F, outer wall by 1300 mm to 500 mm, a 100 mm maximum change. The project has arranged 56 pieces of heavy climbing seats, with all steel template, mainly used for 28 pieces of seats on the outer wall of the building,28 pieces of seats are arranged on the inside wall of the building,the other position of the core barrel use the Spread Wooden template system.
出处
《江苏建筑》
2017年第B12期71-72,76,共3页
Jiangsu Construction
关键词
爬模
提升
安全
climbing formwork
hoisting
safety