漓江桥过江给水管道工程施工方案分析

Analysis on Construction Scheme of the River-crossed Water Supply Pipeline Project of Lijiang Bridge
下载PDF
导出
摘要 针对漓江桥过江给水管道工程实际情况,在简单介绍过江给水管道基本施工方法的基础上,对具体的施工方案进行了深入分析,内容包括施工安排、控制点复核与测放、管槽开挖、管槽整平、管道加工、管道沉放、支墩施工、管槽回填、附属设施施工和雨季、冬季施工。 Aiming at the actual situation of the The river-crossing pipeline project of Lijiang bridge, based on the brief introduction of the basic construction method of the civet-crossed water supply pipeline, the detailed construction plan is deeply analyzed. The contents include construction arrangement, control point rechecking andplacing, pipe trench excavation, pipe flattening and leveling, pipe processing, pipe placing, buttress construction, pipe slot backfilling, auxiliary facilities construction, rainy season and winter construction.
作者 曾凯
出处 《工程建设与设计》 2018年第5期158-161,共4页 Construction & Design for Engineering
关键词 漓江桥过江给水管道 水下管道 施工方案 The river-crossing pipeline of Lijiang bridge underwater pipeline construction scheme
  • 相关文献

参考文献10

二级参考文献6

  • 1刘敏林.沉管施工技术在过河管道中的应用[J].西部探矿工程,2004,16(9):165-166. 被引量:18
  • 2GB50017-2003,钢结构设计规范[S].北京:中国建筑工业出版社,2003.
  • 3赵立春.给水管道施工质量控制探讨[J].工程建设,2012,55(5).
  • 4王民,李玉梅.过江管道工程重要性研究[J].水利建设,2010,10(1).
  • 5戴云舟.海洋磁力仪应用[c]//中国航海学会航标专业委员会测绘学组学术研讨会学术交流论文集.北京:中国航海学会,2006:138-140.
  • 6吕邦来.海底管线的地球物理探测技术探讨[J].水运工程,2009(7):146-150. 被引量:18

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部